PERIODIC TESTING OF EMERGENCY AND EXIT LIGHTS

PERIODIC TESTING OF EMERGENCY AND EXIT LIGHTS
PERIODIC TESTING OF EMERGENCY AND EXIT LIGHTS

INTRODUCTION
Emergency and exit lights provide illumination for safe exit during power outages.
Fermilab has approximately 4000 emergency lights in 330 buildings and enclosures.
Fermilab uses a testing program to assure proper light function during emergencies.

RESPONSIBILITIES
Divisions/Sections are responsible for assuring that emergency and exit lights in areas
for which they have landlord responsibility are tested periodically according to the
procedure outlined below.
Emergency lights are to be tested on a monthly and annual basis as described below.
Exit lights are to be tested monthly as described below. Those exit lights powered by
an Uninterruptible Power Supply (UPS) are to be tested on an annual basis as well.

REFERENCE
NFPA 101-7.9, Emergency Lighting National Fire Protection Association 101 Life
Safety Code, 2003 ed.
NFPA 101-7.8, 7.10, Exit Lighting Emergency Lighting National Fire Protection
Association 101 Life Safety Code, 2003 ed.

PROCEDURE
Tests
a. Monthly Tests. All emergency/exit lights shall be tested monthly for at
least 30 seconds by activation of the test mechanism, unplugging the
unit, or activating the local circuit breaker. The light passes the test if it
emits a plainly visible light for the duration of the test.
b. Annual Tests. All emergency lights (and appropriate exit lights) shall be
tested annually by activation of the test mechanism or unplugging the
unit for at least 90 minutes. The light passes the test if it emits a plainly
visible light at the end of the test.
c. Exception. Emergency lighting units located in beamlines generally
inaccessible to personnel due to beamline operation are exempted from
the requirements of 1.a and 1.b above. Units in such areas shall be tested
as follows:
(i) Operating Periods (Generally inaccessible to personnel) - no
testing required.
(ii) Shutdown Periods (Generally accessible to qualified personnel),
Duration of Less Than 10 Days - no testing required.
(iii) Shutdown Periods, Duration of 10 Days to 30 Days - one-30
second test during the shutdown period.
(iv) Shutdown Periods, Duration of 30 Days to 1 Year - one 90 minute
test during the shutdown period and 30 second tests at 30 day
intervals for the duration of the shutdown period.
(v) Shutdown Periods, Duration Greater Than 1 Year - follow the
requirements of 1.a and 1.b above.

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online
Marine Notes Online Order Form
                              Buy Online via Secure Paypal or Fill Order Form for Alternative.

INFORMATION RESOURCES ON PASSENGER SHIP SAFETY - Maritime Knowledge Centre

INFORMATION RESOURCES ON PASSENGER SHIP SAFETY - Maritime Knowledge Centre

Maritime Knowledge Centre
INFORMATION RESOURCES ON PASSENGER SHIP SAFETY


CONTENTS
IMO Material on the Website 3
IMO Documents 3
· Resolutions 3
· Circulars 4
· MSC 4
· COMSAR 6
· DE 6
· FP 7
· NAV 8
· SLF 9
· STW 10
IMO Publications 11
Conferences and Seminars 12
Other Publications 13
Internet Resources 14
Articles from the Press 15

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online
Marine Notes Online Order Form
                             Buy Online via Secure Paypal or Fill Order Form for Alternative.

REVISED GUIDELINES AND SPECIFICATIONS FOR OIL DISCHARGE MONITORING AND CONTROL SYSTEMS FOR OIL TANKERS

REVISED GUIDELINES AND SPECIFICATIONS FOR OIL DISCHARGE
MONITORING AND CONTROL SYSTEMS FOR OIL TANKERS

ANNEX 14
RESOLUTION MEPC.108(49)
Adopted on 18 July 2003
REVISED GUIDELINES AND SPECIFICATIONS FOR OIL DISCHARGE
MONITORING AND CONTROL SYSTEMS FOR OIL TANKERS

THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

RECALLING Article 38(a) of the Convention on the International Maritime Organization
concerning the functions of the Marine Environment Protection Committee conferred upon it by
international conventions for the prevention and control of marine pollution,

NOTING that regulation 15(3)(a) of Annex I of the International Convention for the
Prevention of Pollution from Ships, 1973, as modified by the Protocol of 1978 relating thereto
(MARPOL 73/78), specifies that oil tankers of 150 gross tonnage and above shall be fitted with
an oil discharge and monitoring control system approved by the Administration and designed and
installed in compliance with the Guidelines and Specifications for Oil Discharge Monitoring and
Control Systems for Oil Tankers adopted by the Organization,

NOTING ALSO resolution A.586(14) entitled “Revised Guidelines and Specifications for
Oil Discharge Monitoring and Control Systems for Oil Tankers” developed in implementation of
the said regulation,

NOTING FURTHER regulation 14 of Annex II of MARPOL 73/78 in respect of the
carriage of category C and D oil- like substances in oil tankers,

RECALLING that by resolution A.886(21) the Assembly resolved that, in order to
establish a uniform procedure, the function of adopting or amending performance standards and
technical specifications referred to in the substantive text of MARPOL 73/78 and other IMO
instruments, shall be performed by the Marine Environment Protection Committee and/or the
Maritime Safety Committee, as appropriate,

HAVING CONSIDERED, at its forty-ninth session, the recommendation submitted by
the Sub-Committee on Ship Design and Equipment in light of the requirements of Annex I of
MARPOL 73/78,

1. ADOPTS the Revised Guidelines and Specifications for Oil Discharge Monitoring and
Control Systems for Oil Tankers, the text of which is set out in the Annex to this resolution, for
application to oil tankers the keels of which are laid or which are in a similar stage of
construction (hereinafter referred to as “constructed”) on or after 1 January 2005;
2. INVITES Governments to implement these Revised Guidelines and Specifications when
approving oil discharge monitoring and control systems being installed under regulation 15(3)(a)
of Annex I of MARPOL 73/78 on oil tankers constructed on or after 1 January 2005.

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online
Marine Notes Online Order Form
                             Buy Online via Secure Paypal or Fill Order Form for Alternative.

ODME Oil Discharge Monitor

ODME Oil Discharge Monitor
Oil Discharge Monitor ODME 2005
The JOWA ODME 2005 Oil Discharge Monitor is approved in accordance
with the test and performance requirements for “third generation” monitors,
according to IMO resolution MEPC 108(49).
The requirements of the MAR POL Convention are that all oil tankers with a
gross tonnage of 150 GRT and above must have an oil discharge monitoring
and control system installed, incorporating an approved oil content meter, with
a starting interlock and an automatic overboard valve control system.

Main Features
»» Oil content meter is certified to meet the requirements of IMO and MEPC 108(49)
»» The measuring range is 0-1000 ppm
»» Easy to operate as it is a minimum of buttons to press and self explanatory menus
»» Robust, easy to install and easy to maintain
»» A unique self-cleaning feature, making manual cleaning virtually unnecessary
»» A high quality product. The components are designed for obtaining long lifetime in a rough
environment
»» Approvals: GL, USCG, RMRS and CCS

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online
Marine Notes Online Order Form
                             Buy Online via Secure Paypal or Fill Order Form for Alternative.

Pumps Installation, Operation and Maintenance Instructions

Pumps Installation, Operation and Maintenance Instructions
Pumps Installation, Operation and Maintenance Instructions


Table of Contents

Safety Instructions ........................................................ 2
Description and Specifications ...................................... 2
1. Important Information ............................................. 2
2. Installation ................................................................ 2
3. Suction Piping........................................................... 3
4. Discharge Piping ....................................................... 3
5. Motor to Pump Shaft Alignment .............................. 3
6. Rotation ................................................................... 4
7. Operation ................................................................. 4
8. Maintenance ............................................................. 4
9. Disassembly .............................................................. 4
10. Reassembly ............................................................. 5
11. Trouble Shooting Guide ......................................... 5
Materials of Construction ............................................. 6
Goulds Pumps Limited Warranty.................................. 8


DESCRIPTION and SPECIFICATIONS
The Models 3657 (close-coupled) and 3757 (framemounted) are single-stage end-suction pumps designed for ultra-pure water systems, O.E.M. applications, food and beverage processing and chemical services not demanding ANSI standard equipment.The pumps have fully enclosed, investment cast, AISI TYPE
316 stainless steel impellers, key driven and held in position by an o-ring sealed locknut. The full volute casings are also investment castings of AISI TYPE 316 stainless steel, back pull-out configuration, with connections for mating with standard 150 lb. ANSI flanges. Shafts are protected with o-ring sealed stainless steel sleeves. Shaft sealing is with mechanical seal.

Important:
1.1. Inspect unit for damage. Report any damage to carrier/ dealer immediately.
1.2. Electrical supply must be a separate branch circuit with fuses or circuit breakers, wire sizes, etc. per National and Local electrical codes. Install an all-leg disconnect switch near pump, ALWAYS DISCONNECT ELECTRICAL POWER WHEN HANDLING PUMP OR CONTROLS.
1.3. Motors must be wired for proper voltage. Motor wiring diagram is on motor nameplate. Wire size must
limit maximum voltage drop to 10% of nameplate voltage at motor terminals, or motor life and pump performance will be lowered.
1.4. Always use horsepower-rated switches, contactors and starters.
1.5. Motor Protection:
1.5.1. Single-phase: Thermal protection for singlephase units is sometimes built in (check nameplate). If no built-in protection is provided, use a contactor with a proper overload. Fusing is permissible.
1.5.2. Three-phase: Provide three-leg protection with properly sized magnetic starter and thermal overloads.
1.6. Maximum Operating Limit(s):
Liquid Temperature: 212°F (100°C) with standard seal. 250°F (120°C) with optional high temp. seal.
Pressure: 175 PSI.
Starts per Hour: 20, evenly distributed.
1.7. Regular inspection and maintenance will increase service life. Base schedule on operating time.
Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online

Marine Notes Online Order Form
                              Buy Online via Secure Paypal or Fill Order Form for Alternative.

General Dynamics Electric Boat Departments

General Dynamics Electric Boat Departments
General Dynamics Electric Boat Departments

Ship Systems Engineering
Disciplines: Mechanical Engineering, Aerospace Engineering, Marine Engineering

This department is responsible for several fluid systems on multiple classes of nuclear submarines and
aircraft carriers. These include air systems, hydraulic systems, ventilation and thermal management systems
for VIRGINIA, SEAWOLF and OHIO submarine classes and CVN21 (aircraft carriers). Also, some
submarine mechanical systems (steering/diving and anchor handling) are under the cognizance of this
department. These systems are all essential to the functionality of submarines designed, built and
supported by Electric Boat Corporation. Technical work includes engineering calculations (e. g. pressure
drop, flow analyses, heat loads, reports, stress analysis of fittings), piping system design, material and
equipment selection, arrangement studies, problem resolution and design improvements. System engineers
are responsible for integrating the system within the ship, development of the operating instructions, test
forms, maintenance procedures and provisioning for fleet support. Also, project management duties (e. g.
budgeting, scheduling, technical integration with other projects) and liaison with the customer, ship’s force
and other contractors will be required. Engineers in this department are required to provide support onboard
submarines under construction and in the fleet. Some travel may be necessary. A Bachelor of
Science degree in mechanical, aerospace or marine engineering and good oral and written communication
skills are prerequisites for engineers in this department.

Dept. 414: Propulsion Plant Fluid System
Disciplines: Mechanical Engineering, Marine Engineering

The Propulsion Plant Fluids Systems department is responsible for reactor plant fluid systems on all
submarine classes and steam plant fluid systems on VIRGINIA, SEAWOLF and OHIO Class Submarines.
Department 414 provides design and planning yard support for new construction and testing activities at
EB (Groton and Quonset Point facilities) and Northrop Grumman Newport News and provides consulting
services and alteration products for commissioned submarines and training prototypes. Engineers routinely
perform research in all facets of engineering to develop innovative solutions to solve technical problems,
perform pressure drop calculations and fluid flow analyses, develop technical work documents and test
procedures, revise provisioning and preventative maintenance documents, develop technical manual
changes and incorporate advanced technologies into the propulsion plant. Using a design build approach
and working in a team environment, engineers interface with designers, component and system engineers,
operations, planning and testing organizations within the shipyard and our Navy customer. System
engineers are responsible for developing and submitting technical recommendations to KAPL and
NAVSEA for approval. Opportunities exist for engineers with a BS or MS in mechanical or marine
engineering. Above average written and verbal communication skills are required. An experienced mentor
will be assigned to each engineer and on the job training will be required.

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online

Marine Notes Online Order Form
                              Buy Online via Secure Paypal or Fill Order Form for Alternative.

Marine Pollution Prevention Pocket Checklist

Marine Pollution Prevention Pocket Checklist
Reducing the risk of Port State Control detentions.

Marine Pollution Prevention Pocket Checklist
Reducing the risk of Port State Control detentions.

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online


Marine Notes Online Order Form
                              Buy Online via Secure Paypal or Fill Order Form for Alternative.

Lithium-Ion Battery Maintenance Guidelines

Lithium-Ion Battery Maintenance Guidelines
Lithium-Ion Battery Maintenance Guidelines


Lithium-Ion rechargeable batteries require routine maintenance and care in their
use and handling. Read and follow the guidelines in this document to safely use
Lithium-Ion batteries and achieve the maximum battery life span.

Overview 
Do not leave batteries unused for extended periods of time, either in the product or
in storage. When a battery has been unused for 6 months, check the charge status
and charge or dispose of the battery as appropriate.
The typical estimated life of a Lithium-Ion battery is about two to three years or
300 to 500 charge cycles, whichever occurs first. One charge cycle is a period
of use from fully charged, to fully discharged, and fully recharged again. Use a
two to three year life expectancy for batteries that do not run through complete
charge cycles.
Rechargeable Lithium-Ion batteries have a limited life and will gradually lose
their capacity to hold a charge. This loss of capacity (aging) is irreversible. As
the battery loses capacity, the length of time it will power the product (run time)
decreases.
Lithium-Ion batteries continue to slowly discharge (self-discharge) when not in
use or while in storage. Routinely check the battery’s charge status. The product
user manual typically includes information on how to check battery status, as
well as battery charging instructions. The latest product manuals are available at
www.tektronix.com/manuals.
Use only Tektronix-approved batteries in your Tektronix products.

Battery Maintenance 
Observe and note the run time that a new fully-charged battery provides for
powering your product. Use this new battery run time as a basis to compare
run times for older batteries. The run time of your battery will vary depending
on the product’s configuration and the applications that you run.
Routinely check the battery’s charge status.
Carefully monitor batteries that are approaching the end of their estimated life.
Consider replacing the battery with a new one if you note either of the
following conditions:
The battery run time drops below about 80% of the original run time.
The battery charge time increases significantly.
If a battery is stored or otherwise unused for an extended period, be sure to
follow the storage instructions in this document. If you do not follow the
instructions, and the battery has no charge remaining when you check it,
consider it to be damaged. Do not attempt to recharge it or to use it. Replace
it with a new battery.

Read More....!

Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online

Marine Notes Online Order Form
                               Buy Online via Secure Paypal or Fill Order Form for Alternative.

Troubleshooting an Air Conditioning system by R D Holder Eng


Troubleshooting an Air Conditioning system by R D Holder Eng and Roger D Holder MSME
Troubleshooting an Air Conditioning system by R D Holder Eng and Roger D Holder MSME

Troubleshooting of an air conditioning system is a step by step procedure. I have found that a 4 step procedure is the best way to see how well a system is operating.
The 4 steps are:
1. Volts and Amps
2. Evaporator Superheat
3. Condensing Subcooling
4. Temperature difference of coils
Not one of these method alone can be used by itself to charge or troubleshoot an air conditioning system rather they must be used together to ensure efficiency and capacity.
Voltage and Amps
When working with voltages and Amps, one must consider the rated voltage and amp compared to the actual voltage and amp. Measure the starting amps along with the running amps of the compressor and all components of a system. When charging an air conditioner system the compressor amps changes due to the change in compression ratio.

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online


Marine Notes Online Order Form
                              Buy Online via Secure Paypal or Fill Order Form for Alternative.

Hot Work in Docks HSE Information Sheet

Hot Work in Docks HSE Information Sheet

Hot Work in Docks HSE Information Sheet


This information sheet is one of a series issued by the
Transportation Section of HSE’s Services,
Transportation and Safety Unit. It gives guidance to
dock and harbour authorities, terminal operators,
contractors, ship’s masters and all other people
carrying out hot work, on the precautions that should
be taken in connection with hot work at docks and on
ships in them. It is not intended to apply to hot work
carried out in shipyards.

Introduction
Over the years hot work in docks, both on ships and
onshore, has resulted in many serious fires and
explosions that have caused death and serious
injuries. As long ago as 1847, the legislation relating to
docks and harbours was consolidated in the
Harbours, Docks and Piers Clauses Act 1847. The Act
contains standard clauses which can be deemed to
be included in Acts relating to specific harbours,
docks and piers. Many such Acts and bye-laws made
under them are still in force today.
The 1847 Act included powers for dock authorities to
make bye-laws for ‘regulating the use of fires and
lights’ in dock premises, and on-board ships in docks.
The Approved Code of Practice to the Dangerous
Substances in Harbour Areas Regulations 1987 and a
number of internationally recognised publications also
advise or require that hot work which may constitute a
hazard due to the presence of dangerous cargo
should only be carried out in docks or on ships in
docks with the permission or authorisation of the
harbour authority. Many authorities have used these
powers to make bye-laws which relate to hot work.

Hot work
Hot work means the use of open fires, flames and
work involving the application of heat by means of
tools or equipment. This includes the unintentional
application of heat, for example by the use of power
tools or hot rivets or hot particles from cutting or
welding operations, falling onto and igniting flammable
material or flammable vapours.

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online

Marine Notes Online Order Form
                              Buy Online via Secure Paypal or Fill Order Form for Alternative.

Backfire Flashback and flame arrestors

Backfire Flashback and flame arrestors Preventive measures
Flashback and flame arrestors
Summary
Backfire and flashback can happen. In oxy-fuel processes it is important to use safety devices to prevent mishaps in the equipment. This issue of “Safety Information” deals with the most frequently used safety devices for the prevention of backfire and flashback in oxy-fuel gas equipment. Oxygen and fuel gas may be hazardous if improperly used or handled. This type of equipment should not be used unless proper safety procedures have been understood and applied. The gas and equipment suppliers should place safety and product information at the disposal of the customer.

Backfire and flash back
In a backfire the flame burns back into the torch with a cracking sound. Either the flame is extinguished, or it is reignited at the nozzle opening. In a sustained backfire the flame continues back into the torch, often reaching the mixing point for oxygen and fuel gas. An initial crack is followed by a whistling sound.
Regarding the cause, general preventative measures and hazards of both backfire and sustained backfire, the
reader should refer to the basic guidelines for welders. This Safety Information will only deal with the specific
risk of flashback, and the safety devices that can prevent it.
In a flash back, the flame recedes through the torch back into one of the supply hoses. The hose can explode. In the worst case, the flame can continue into the regulator and into the cylinder.
Causes of flash back A gas mixture in one of the hoses in combination with a backfire when igniting a burner can cause a flashback. The gas mixture in the hose results from reverse flow, i.e. when gas at a high pressure flows into a hose with a lower pressure. If there is sufficient gas mixture in the hose the explosion can be so violent that the hose bursts.

Preventive measures (see References)
To prevent reverse flow and flashback, safety devices incorporating check valve and flashback arrestor must be mounted on the torch and/or regulators.
The different safety devices are discussed below. They are dealt with in different standards 1,2.
Check valves and flash back arrestors By using available safety devices the risk of flashback can in most cases be avoided. The most common safety devices are check valves and flashback arrestors. In some countries the use of check valve and/or flashback arrestors are mandatory, whereas in other countries the use of these are only recommendations.

Read More....!
Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online

Marine Notes Online Order Form
                              Buy Online via Secure Paypal or Fill Order Form for Alternative.

Fixed Firefighting Systems HALON AGENT


Fixed Firefighting Systems HALON AGENT

Fixed Firefighting Systems
HALON AGENT

GENERAL INFORMATION
The word Halons is short for "halogenated hydrocarbons", in other words,
hydrocarbons containing one or more of the halogens--fluorine, chlorine, or
bromine.
Halons have certain advantages over carbon oxide. Less Halon than carbon
dioxide, for example, would be needed to extinguish a fire of the same size. This is
an important consideration on ships with their weight and space limitations. In
addition, there is some evidence that Halons can extinguish engine room fires more
quickly than carbon dioxide can. The Halons used in firefighting systems are
thought to be effective in breaking the chain reaction which is the mechanism that
keeps fires going. Since the Halon extinguishes the fire by putting an end to this
reaction rather than by filling the room and displacing the oxygen, as carbon
dioxide does, lower concentrations can be used. Whereas carbon dioxide would
require a concentration of 28.5% to be effective, Halon 1301, which is typically
used onboard ships, will extinguish a fire at a concentration level of 6%. This could
be vitally important in the case of accidental release. Since the halon-air mixture
would contain 94% air and only 6% Halon, personnel trapped in an enclosed space
with it, would not be asphyxiated.
Halon is not manufactured anymore. It is regulated by the EPA as a greenhouse
depleting gas. Existing stockpiles may be purchased but no manufacturing is to
take place. If the system is discharged it will most likely be fitted with a new type of
extinguishing agent. Halon 1301 ( the Halon most commonly used for fire
extinguishing purposes) decomposes to form two toxic gases, hydrogen fluoride
and hydrogen bromide, when it is exposed to heat. The American Conference of
Governmental Industrial Hygienists has set recommended maximum exposure
levels for these two gases. If personnel must be exposed to them, the concentration
to which they are exposed should not exceed 3 parts per million (ppm), averaged
over the eight hour workday.
No data were available on how much hydrogen fluoride and hydrogen bromide
were generated when Halon was released or how effective Halon 1301 was in
extinguishing machinery space fires, when the Coast Guard began drafting safety
regulations for Halon. To acquire the necessary data, the Coast Guard, with
support from the marine firefighting industry, ran a series of tests in 1970 in the
engine room of a full-scale ship at the U.S. Coast Guard Fire and Safety Test
Detachment in Mobile, Alabama. The concentration of hydrogen fluoride measured
following release of Halon 1301 varied from 0.1 to 230 ppm and the concentration
of hydrogen bromide from 0.6 to 68 ppm. and More.

Download for Free on Marine Notes Online
Marine Notes Online: Download For Free on Marine Notes Online

Marine Notes Online Order Form
                               Buy Online via Secure Paypal or Fill Order Form for Alternative.

 

Blog Archive

Followers

Online Marketing Oferty i praca w Zarabiaj.plglobeofblogs IndiBlogger - The Largest Indian Blogger Community Books Blogs - BlogCatalog Blog DirectoryHobbies Blogs - Blog Rankings Hobbies Blogs - Blog Rankings
MarineNotesOnline Facebook MarineNotesOnline Twitter MarineNotesOnline RSS MarineNotesOnline Facebook MarineNotesOnline Order Marine Notes Online Free Download

QUESTIONS ?

Need Quick Help Support ?
Email: marinenotesonline@gmail.com
Get Access of Books and Notes Easily

Search This Blog

Copyright 2010 Marine Notes - All Rights Reserved.